The loan amount as a percentage of the project's total cost, used mainly for construction and heavy value-add loans.

Formula

LTC = Loan amount ÷ Total project cost

What it is

Loan-to-cost compares the loan to what the project will cost to build or reposition, not to what it will be worth. It is the main leverage test for construction loans and is common on value-add bridge loans where renovation money is part of the loan.

The logic is simple. Before a building exists, there is no income to value. Cost is the most solid number available.

How it's calculated

Add up the full budget, then divide the loan by it.

Budget lineAmount
Land$4,000,000
Hard costs$12,500,000
Soft costs$2,500,000
Financing costs and interest reserve$1,000,000
Total project cost$20,000,000
Loan amount$13,000,000
LTC65%

The sponsor funds the remaining $7,000,000, usually before the lender's first draw.

What counts as cost

Lenders differ on details, so read the term sheet.

  • Land is often counted at purchase price or appraised value, whichever is lower. Land bought years ago at a low basis can shrink the cost base, though some lenders give credit for appreciation.
  • Hard costs cover construction itself, usually supported by a general contractor's bid or contract.
  • Soft costs include architecture, engineering, permits, legal and insurance.
  • Contingency is expected. A budget with none looks unrealistic.
  • Interest reserve and financing fees are typically included in total cost.

How lenders use it

Construction lenders commonly set maximum LTC somewhere in the 50% to 75% range, varying by lender, asset class, sponsor strength and market. They usually check LTV on the completed value as well, often called loan-to-stabilized-value. A deal can pass one test and fail the other.

The loan funds in draws as work is completed, after the borrower's equity is in. Lenders track LTC through the project and may require more equity if costs run over.

Common mistakes

  • Leaving costs out to make LTC look lower. An understated budget gets caught in the lender's cost review and damages credibility.
  • Confusing LTC with LTV. A 65% LTC loan on a project worth more than cost may be 50% LTV. Show both.
  • No contingency. It signals inexperience, and lenders will add one anyway.

In the package

Include the full budget, the contractor's bid, the schedule, and a sources and uses table showing how equity and debt fill the capital stack. See how to package a commercial real estate loan for the rest of the checklist.

One closed deal covers the year.

Start on the introductory rate and see a package come out of a real deal this week.

Get started Book a demo$360 for the first month, then $1,000. Cancel anytime.